The city is approving a contract with Arcadis U.S., Inc. to program and configure telemetry systems at 20 remote sites and the water treatment plant. This is Phase 3 of an ongoing water infrastructure modernization effort.
Note: The title contains a likely typographical error in the dollar amount ('six hundred, ninety-seven thousand, one hundred and seventy thousand dollars'); the numeric figure $697,170 is used here as the authoritative amount.
The City Commission is considering a resolution authorizing Arcadis U.S., Inc. to perform Phase 3 telemetry programming and configuration services at 20 remote sites and the Water Treatment Plant for a fee not to exceed $697,170. This is a technical infrastructure contract for the city's water utility operations.
Note: The title contains a typographical error ('Six Hundred, Ninety-Seven Thousand, One Hundred and Seventy Thousand Dollars'), suggesting the figure may be $697,170 but the drafting error could be worth flagging if you are reviewing procurement documents.
The City Commission is considering authorizing Arcadis U.S., Inc. to perform Phase 3 telemetry programming and configuration services across 20 remote sites and the Water Treatment Plant for up to $697,170. This is a professional-services work authorization, not a construction contract.
Note: The dollar figure in the title appears to contain a typographical error ('six hundred, ninety-seven thousand, one hundred and seventy thousand dollars') — the numeric value $697,170 is assumed correct.