📍 NW 112 Ave and NW 82 St, Doral, FL
The City of Doral is hiring Stantec Consulting Services to design and permit a new roundabout at the intersection of NW 112 Avenue and NW 82 Street, at a cost not to exceed $76,769. This is the design/permitting phase, meaning construction is a later step.
Note: This resolution covers design and permitting only; construction timeline, total project cost, and exact traffic impact are not yet determined.
The resolution authorizes the City Manager to execute a work order with Stantec Consulting Services for engineering design and permitting of a new roundabout at NW 112 Avenue and NW 82 Street, capped at $76,769.36. This is a professional services contract drawn from already-budgeted funds.
Note: Item is straightforward on its face; low relevance assigned because it is a routine engineering services contract with no apparent land-use, litigation, or code-amendment dimension.
The City of Doral is authorizing Stantec Consulting Services to handle design and permitting for a new roundabout at NW 112 Avenue and NW 82 Street, for up to $76,769.36. This is the engineering/design phase, which typically precedes a separate construction contract bid.
Note: Design contract value is below the $250k threshold, but it signals an upcoming construction procurement that will likely exceed it.
The city is hiring Stantec Consulting to design and permit a new roundabout at the intersection of NW 112 Avenue and NW 82 Street, at a cost not to exceed $76,769. This is the engineering/design phase, meaning construction is still further out.
Note: Only the design contract is being approved; construction timeline and full project cost are not specified in this item.